浅谈设计单位牵头的国内总承包的安全管理
浏览(4696) 下载(3)
- DOI:
- 作者:
- 张海涛
- 作者单位:
- 中国石油集团工程设计有限责任公司北京分公司
- 关键词:
- 设计单位牵头、EPC总承包、安全管理
- 摘要:
- 2003年,建设部明确将EPC总承包模式作为一种主要的工程总承包模式予以政策推广。本文主要论述以设计单位牵头的总承包的模式下,在安全管理方面存在的安全生产费用提取及使用不规范、安全管理人员配备不足、安全管理基础薄弱、管理制度缺乏针对性、操作性不强等问题以及针对这些问题的一些措施和方法。
In 2003, The EPC model was given policy promotion explicitly as a major engineering contracting model by ministry of housing and urban-rural development of the people's republic of China (MOHURD).Currently,as engineering being the leader in the EPC model, There are the following issues in terms of safety management:Safe production cost extraction and useing is not standardized,Lack of safety management staff,Weak foundation of Safety management,The management system is not targeted and operational,This article focuses on the above issues, as well as the response and methods to these problems.